Call Us Today
(800) 288-4505

Phoenix, AZ
(602) 275-4505

Salt Lake City, UT
(801) 901-8888

Houston, TX
(713) 804-2125

Questions & Quotes
Home / Dispatch Consoles / WAVE PTT Web Dispatch
Motorola Logo
Motorola WAVE example screen

Basic processes are established, but they are not formally documented or enforced. Different people or departments may follow different methods. There is some consistency, but mainly due to informal training or habit. No formal communication or training exists.

COBIT 4.1 popularized a six-level maturity scale (0 to 5). While COBIT 5 and 2019 have introduced a more detailed capability model using process attributes (rated from "incomplete" to "optimizing"), the classic 0–5 scale remains widely understood for high-level assessments.

Processes are sporadic and unorganized. There is little to no formal planning or documentation. Success depends on individual effort and heroics rather than repeatable procedures. Management awareness is low.

In the context of COBIT (Control Objectives for Information and Related Technology), maturity levels are used to assess and rate how well an organization’s IT processes are developed, managed, and controlled. Based on the Capability Maturity Model (CMM), these levels provide a benchmark for improvement, helping organizations move from chaotic, ad-hoc activities to optimized, continuously improving processes.

Procedures are standardized, documented, and communicated through formal training. However, the organization relies on mandatory compliance rather than proactive improvement. Processes are aligned with business goals, but measurement is still limited.

Here are the six COBIT maturity levels:

The organization has no basic IT processes in place. Management has not even recognized that an issue or process needs to be addressed. Complete chaos or complete lack of control.

Recommended Industries

Transportation

Transit

Education

EMS

Utilities

Government

Healthcare

Hospitality

Public Safety

Public Works

Event Management

Waste Management

Cobit Maturity Level Online

Basic processes are established, but they are not formally documented or enforced. Different people or departments may follow different methods. There is some consistency, but mainly due to informal training or habit. No formal communication or training exists.

COBIT 4.1 popularized a six-level maturity scale (0 to 5). While COBIT 5 and 2019 have introduced a more detailed capability model using process attributes (rated from "incomplete" to "optimizing"), the classic 0–5 scale remains widely understood for high-level assessments. cobit maturity level

Processes are sporadic and unorganized. There is little to no formal planning or documentation. Success depends on individual effort and heroics rather than repeatable procedures. Management awareness is low. Basic processes are established, but they are not

In the context of COBIT (Control Objectives for Information and Related Technology), maturity levels are used to assess and rate how well an organization’s IT processes are developed, managed, and controlled. Based on the Capability Maturity Model (CMM), these levels provide a benchmark for improvement, helping organizations move from chaotic, ad-hoc activities to optimized, continuously improving processes. No formal communication or training exists

Procedures are standardized, documented, and communicated through formal training. However, the organization relies on mandatory compliance rather than proactive improvement. Processes are aligned with business goals, but measurement is still limited.

Here are the six COBIT maturity levels:

The organization has no basic IT processes in place. Management has not even recognized that an issue or process needs to be addressed. Complete chaos or complete lack of control.

Contact Air Comm today and let us find the ideal solution for you.

cobit maturity level